P
EO´s (Private Engineering Office) proposed project was to construct, develop and operate a 5 Star Island Resort property, which is located approx. 3.5 km from New Doha International Airport (NDIA).
As irrigation water availability is one of the most critical issues for the client in this prestigious project, Zeoplant was already part of the project in the design stage which was headed by South Africa‘s LMS International.
The complete irrigation network, e.g. water tank, pump sizes and main line dimension, was designed and built according to the drastically reduced water requirements being achieved with Zeoplant.
The immense benefits of a reduced network infrastructure in combination with irrigation water savings were highly cost effective for the client, but also for the executing contractor UCC (UrbaCon General Contracting), due to reduced construction cost and future maintenance.